- Client: National Grid
- Architect: Jacobs Engineering Group
- Construction Manager: Murphy International limited
Scope of Works
- Over 19,000m2 of Durasteel® 240EI boarding system complete with over 52,000Lm of galvanised channels and 27,000m2 of Mineral Insulation
- 6,500m2 of Vermiculux boarding
- Cavity Barriers
- Fire Stopping
- Timber and Durasteel® Fire Doors
The fire that ripped through this Station on 15th of September 2021 had shut down part of this interconnector.
Overview
The loss of the 1 Gigawatt link, which is a net importer of power from France, has put a strain on the UK’s network, which was already facing a supply crunch that has seen market prices surge to a record high. It was being reported that, as a result, coal plants are being warmed up to cover the loss and meet the expected increase in demand.
What we did
Sharpfibre Limited entered talks early in the spring of 2022 and after several discussions with Murphy and Jacobs we were appointed to start the works in late June. Multiple teams of highly skilled and experienced specialists from different internal departments within Sharpfibre were swiftly assembled to take on the challenge.