Services
Fire Risk Assessments & Strategies

A Fire Risk Assessment (FRA)
The foundational step in protecting your premises, people, and assets from fire. It's not just a legal requirement; it's a critical tool for identifying potential hazards and ensuring the safety of everyone who uses your building.
We provide detailed, compliant, and pragmatic Fire Risk Assessments conducted by highly qualified professionals.
Our assessments go beyond simple checklists to deliver a clear and actionable report that covers:
- Identification of Hazards: Pinpointing ignition sources, fuel loads, and potential risks within your building.
- Identification of People at Risk: Determining who is most vulnerable, especially those with disabilities or working alone.
- Evaluation and Action Plan: Detailing what control measures are already in place and what additional actions are necessary to reduce the risk.
- Review: Establishing a schedule for regular review and maintenance of the FRA.
Implementing a robust fire strategy
Following the assessment, we help you develop a robust Fire Strategy. This is a live document that outlines the overall management and operational procedures required to implement the necessary safety measures.
Our strategic services include:
- Management Systems: Establishing clear roles, responsibilities, and procedures for fire safety management.
- Mitigation Measures: Providing recommendations for passive fire protection (e.g., fire doors, compartmentalization) and active fire protection (e.g., alarms, sprinklers).
- Emergency Planning: Developing clear evacuation procedures and training requirements for staff.
Partner with us to transform your legal obligation into a clear, effective, and sustainable safety strategy, ensuring your buildings are compliant and your people are protected.
Some of our Recent Projects
Barking Riverside Station, London
Transport for LondonHavenhuis, Port of Antwerp, Belgium
Victor Buyck Steel ConstructionWestfield, London
Westfield Shoppingtowns LimitedTesco, Woolwich Central, London
Tesco PLCIt quickly became apparent that very few suppliers or installers could meet the huge challenges the project presented. Thankfully, due to the national importance of the project, Sharpfibre were able to meet these challenges. Installing over 13,000m2 of Durasteel and 5,500m2 of Vermiculux S to provide 4-hour compartment walls, ceilings and protection to structural steelwork in a matter of weeks.
Sharpfibre dealt with multiple design, installation and co-ordination problems throughout the project. Remarkably given the volume of work completed, the installation was of extremely high quality as observed by the multiple site inspections undertaken during installation by Etex Building Performance.
Sharpfibre were brave to even attempt a job of this scale and have delivered with merit to the benefit of national grid and the country. In our view given the scale, importance and complexity of the installation it would be extremely deserving of the award for best project of the year.
We’ve worked with Sharpfibre through 2 PCSA agreements on our £300m TQA1 project. Here they have provided technical advice on penetration seals, cavity barriers, gap seals & fire boarding across our project. Over the 18 months they have been onsite they have worked proactively to ensure compliance with manufactures tested details and resourced the job appropriately when asked. They have maintained excellent records of their works and have been a pleasure to work with. Their passion and their expertise have been much appreciated, and I’d recommend them to other principal contractors who are after a competent firestopping sub-contractor
It has been a pleasure working with Sharpfibre throughout the barker project and look forward to the next one
Thank you for the shift report. It is encouraging to observe you and the team collaborating effectively. I appreciate the results we are currently achieving on-site as the lean expert, and I have no additional comments regarding the working process. In his own words, we appear to be well-organized and functioning cohesively.
From our initial enquiry through to the completion of the project Sharpfibre went above and beyond to ensure the project was completed on time and budget. This involved working in difficult conditions on a daily basis, and your technical support throughout the project was invaluable to ensure the works undertaken met the specification required on this project. The project commenced in November 2023 and was delivered in very tight deadline.
It is phenomenal to see the progress that has been made on the rebuild since demolition was completed in March… What really impressed me was the level of communication and cooperation you have generated… What gave me confidence today was the quality of the build I saw – no evidence that build quality is being impaired by schedule yet…
Behind it’s striking new facade and in what has become a landmark development in Southend, Beaumont Court & Richmond House offers not only a superior style of apartment, but a brighter way of life in the heart of Southend on Sea
Sharpfibre’s involvement during the design development stage was invaluable in ensuring the buildings critical design performance requirements were fully satisfied and hence delivering the right solution to both the client and the construction team.













More Services

Trust us to be your steadfast partner in
securing compliance, safety, and peace of mind.
From initial planning to seamless post-installation support, Sharpfibre offers an all-encompassing solution that spans a wide range of products, effectively addressing the majority of passive fire-related concerns.
Request a Quote Request a QuoteCollaborate with us
Submit an enquiry, we’ll be in touch
