Barking Riverside Station, London

  • Client: Transport for London
  • Architect: Weston Williamson
  • Construction Manager: Volker Fitpatrick & Morgan Sindall Construction (MSVF)
  • Scope of Works
  • 750m2 of Fire Rated Ceilings to Mezzanine Floors
Read More

The Barking Riverside rail extension adds 4.5km of new track to the Gospel Oak to Barking Overground line and includes a new Station at Barking Riverside.

Barking Riverside is the largest housing development in East London, with planning permission for up to 10,800 new homes, as well as healthcare, shopping, community, and leisure facilities.

In conjunction with Etex, Sharpfibre installed a project specific solution comprising of Promat PROMATECT®-250, which is a non-combustible mineral bound light weight board that gives a high degree of strength and dimensional stability. It offered a quickly installed solution for the fire protection of the Mezzanine Floors and is suitable for areas of high humidity.

One challenge to overcome was how the perimeter of the fire rated ceilings interfaced with the existing steelwork and blockwork. Sharpfibre’s final installed solution demonstrated how passive fire protection can create both a decorative and functional solution, as well providing a high level of fire protection.

 

Product Information

Promat PROMATECT© 250 comprises autoclaved calcium silicate spheres bound in a mineral mix to form a solid board. One face is smooth and ready to form a finished surface and can receive almost any form of finish or treatment. PROMATECT© 250 is resistant to the effects of moisture and can give up to 120 minutes fire protection